California ADU Cost & ROI Calculator
What an ADU or garage conversion costs to build in 20 California cities, with each city's permit, impact and school fees and the state exemptions applied, and how long the rent takes to pay it back.
Updated · By Niraj Kumar · 11 sources
https://checkpre.com/construction/adu-cost-calculator
1. The ADU
School fees start above 500 sq ft and impact fees at 750 sq ft.
Impact fees from 750 sq ft are scaled by the ADU's size against the house.
2. Site work
Distance from the house's sewer lateral to the ADU.
Architect, structural engineer, Title 24 and survey, as a share of the build. About 4% with a city pre-approved plan.
3. Los Angeles fees
Los Angeles estimate.
Waived: under 750 sq ft (state law).
Charged on new detached and attached units.
$5.38 a sq ft on the whole unit.
4. Rent and financing
HUD's FY 2026 fair market rent for the metro, a conservative figure. Enter a local listing to replace it.
Charged on the ADU's construction cost only; the house is not reassessed.
Net rent ÷ cap rate is how appraisers value income. 4-6% is typical for California rentals.
At 500 sq ft it would pay no school fees, saving $3,228.
- Construction
- $298,252
- build, site work, design and contingency
- City and school fees
- $16,728
- Monthly cash flow, year one
- $1,466
- on $2,085 rent
- Payback
- 14.4 years
- 5.6% cash-on-cash in year one
- Value added
- $351,732
- $36,752 more than it costs, at a 5% cap rate
- 1Construction$241,500
- 2Contingency$25,358
- 3Design and engineering$19,320
- 4Utility trenching$12,075
- 5Permit and plan check$9,000
- 6Sewer and water capacity$4,500
- 7School fees$3,228
Year-by-year rent and cash flowShowHide
| Year | Rent collected | Running costs | Loan | Cash flow | Cumulative |
|---|---|---|---|---|---|
| 1 | $23,769 | $6,182 | $0 | $17,587 | -$297,394 |
| 2 | $24,482 | $6,335 | $0 | $18,147 | -$279,247 |
| 3 | $25,217 | $6,492 | $0 | $18,725 | -$260,522 |
| 4 | $25,973 | $6,652 | $0 | $19,321 | -$241,201 |
| 5 | $26,752 | $6,817 | $0 | $19,935 | -$221,266 |
| 6 | $27,555 | $6,986 | $0 | $20,569 | -$200,697 |
| 7 | $28,381 | $7,159 | $0 | $21,222 | -$179,475 |
| 8 | $29,233 | $7,337 | $0 | $21,896 | -$157,579 |
| 9 | $30,110 | $7,520 | $0 | $22,590 | -$134,989 |
| 10 | $31,013 | $7,707 | $0 | $23,306 | -$111,683 |
| 11 | $31,944 | $7,899 | $0 | $24,045 | -$87,638 |
| 12 | $32,902 | $8,096 | $0 | $24,806 | -$62,832 |
| 13 | $33,889 | $8,298 | $0 | $25,591 | -$37,241 |
| 14 | $34,906 | $8,505 | $0 | $26,400 | -$10,840 |
| 15 | $35,953 | $8,718 | $0 | $27,235 | $16,395 |
| 16 | $37,031 | $8,936 | $0 | $28,095 | $44,490 |
| 17 | $38,142 | $9,160 | $0 | $28,982 | $73,472 |
| 18 | $39,287 | $9,390 | $0 | $29,897 | $103,369 |
| 19 | $40,465 | $9,626 | $0 | $30,840 | $134,208 |
| 20 | $41,679 | $9,867 | $0 | $31,812 | $166,020 |
How the California ADU Cost & ROI Calculator works
A new detached ADU in California typically costs $200,000 to $350,000 all in, or $300 to $500 a square foot; a garage conversion costs 35-45% less. City and school fees add $3,000 to $20,000. Staying under 750 sq ft avoids impact fees, and at 500 sq ft or less school fees too.
The build cost is the floor area times a cost per square foot for the type of ADU and the level of finish, adjusted for local building costs, plus trenching for sewer, water and power, design and a contingency. Fees follow state law: no impact fees under 750 sq ft and only a proportional share above, no sewer or water capacity charge on a conversion, and no school fee at 500 sq ft or less. The return compares rent, after vacancy, property tax on the added value, insurance, upkeep and any loan, with the cash you put in.
Cost = sq ft × rate₍type, finish₎ × city index + utility runs + panel + design + contingency + fees
fees = permit + impact × (ADU ÷ house, from 750 sq ft) + capacity (new builds) + school × sq ft (over 500)
Payback: Σ₍y₎ (rent × (1 − vacancy) − tax − insurance − upkeep − loan) ≥ cash invested- city index
- Local construction cost against the California average
- impact
- City parks, traffic and facilities fees, charged only from 750 sq ft
- capacity
- Sewer and water capacity charges, waived for conversions
- school
- District developer fee, at most $5.38 per sq ft in 2026
- NOI
- Net operating income: rent after vacancy and running costs, before the loan
| City | 600 sq ft | 800 sq ft | 1-bed rent | Fee figures |
|---|---|---|---|---|
| Los Angeles | $16,728 | $21,304 | $2,085 | Estimate |
| San Diego | $23,450 | $24,526 | $2,459 | City schedule |
| San José | $9,519 | $21,407 | $2,982 | City schedule |
| San Francisco | $14,228 | $19,304 | $2,325 | Estimate |
| Fresno | $6,974 | $14,232 | $1,350 | City schedule |
| Sacramento | $8,978 | $14,304 | $1,600 | City schedule |
| Long Beach | $8,872 | $13,314 | $2,085 | City schedule |
| Oakland | $11,728 | $20,804 | $2,325 | Estimate |
| Bakersfield | $8,228 | $12,804 | $1,200 | Estimate |
| Anaheim | $10,228 | $17,804 | $2,350 | Estimate |
| Santa Ana | $9,728 | $16,304 | $2,350 | Estimate |
| Riverside | $8,228 | $15,304 | $1,700 | City schedule |
| Irvine | $10,728 | $19,804 | $2,350 | Estimate |
| Chula Vista | $9,228 | $22,304 | $2,459 | Estimate |
| Fremont | $10,228 | $14,304 | $2,325 | Estimate |
| Santa Clarita | $13,728 | $21,304 | $2,085 | Estimate |
| San Bernardino | $8,228 | $14,304 | $1,700 | Estimate |
| Pasadena | $11,128 | $13,804 | $2,085 | City schedule |
| Berkeley | $9,728 | $13,304 | $2,325 | Estimate |
| Santa Monica | $14,728 | $23,804 | $2,085 | Estimate |
Worked example
A 600 sq ft detached one-bedroom ADU at standard finish behind a 1,600 sq ft house in Los Angeles, with utility lines run 50 ft from the house, paid in cash.
- 1Construction: 600 sq ft at about $402 a sq ft is $241,500; utility trenching adds $12,075, design $19,320 and a 10% contingency $25,358
- 2Fees: $9,000 in permit and plan check, no impact fees (under 750 sq ft), $4,500 in sewer and water capacity, and $3,228 in school fees
- 3Rent of $2,085 a month less 5% vacancy, property tax, insurance and upkeep leaves $17,587 a year
The ADU costs about $314,980 all in, $525 a sq ft, of which $16,728 is fees. The rent repays it in about 14.4 years, a 5.6% cash return in the first year.
Frequently asked questions
How much does it cost to build an ADU in California?
Most new detached ADUs cost $300 to $500 a square foot all in, so a 600 sq ft unit runs roughly $200,000 to $300,000, more in San Francisco and the coastal cities and less in the Central Valley. Attached ADUs cost a little less, and garage conversions and junior ADUs, which reuse an existing structure, cost about half as much per square foot. Pick a city in the calculator for its local cost level and fees.
Does an ADU add value to my property?
Usually more than it costs where rents are high. Appraisers value rental property by its income: net rent divided by a capitalisation rate. At a 5% cap rate, an ADU netting $20,000 a year adds about $400,000 of value. Lenders and appraisers vary in how much credit they give a single-family home's ADU, so treat the figure as a ceiling.
Are ADUs under 750 square feet exempt from impact fees in California?
Yes. Government Code §66324 bars cities, counties and special districts from charging impact fees on an ADU under 750 sq ft. From 750 sq ft they may charge, but only in proportion to the ADU's size against the main house: a 750 sq ft ADU behind a 1,500 sq ft house pays at most half the fee a new house would. Building permit and plan check fees still apply at any size.
Do ADUs pay school fees?
Only over 500 sq ft. Education Code §17620 exempts ADUs of 500 sq ft or less. Above that, the school district charges its developer fee on every square foot, at most $5.38 a sq ft from January 2026. A 600 sq ft unit pays about $3,200; staying at 500 sq ft avoids it entirely.
Why is a garage conversion so much cheaper?
The shell, roof and slab already exist, so the build cost per square foot is roughly half that of a new detached unit, and state law bars sewer and water capacity charges on an ADU made inside existing space. Expect to add insulation, windows, a new floor over the slab and plumbing that may need a trench to the sewer line.
Will an ADU raise my property tax?
Only on the ADU. Under Prop 13 the assessor adds the value of the new construction to your existing assessed value, without reassessing the main house. At the base 1.1% rate, a $250,000 ADU adds roughly $2,750 a year, rising at most 2% a year after that.
Do I have to live on the property to rent out an ADU?
No, for an ADU: state law has barred owner-occupancy requirements on ADUs since 2020 and made that permanent from 2025. A junior ADU, which is carved out of the house, still requires the owner to live in either the house or the JADU. Cities may require rentals of 30 days or longer, and most do, which rules out short-term holiday lets.
Sources
- California Gov. Code §66324: impact fees and utility charges for ADUs · checked
- California Ed. Code §17620: school fees, with ADUs of 500 sq ft or less exempt · checked
- HCD, Accessory Dwelling Unit Handbook · checked
- State Allocation Board: Level 1 school fee raised to $5.38 per sq ft (28 January 2026) · checked
- HUD Fair Market Rents, FY 2026 · checked
- City of San José, Building Division fee schedule · checked
- City of Long Beach, Development Impact Fees · checked
- SFPUC, Capacity charges · checked
- City of Fresno, ADU Quick Start Guide · checked
- Los Angeles Department of City Planning, Parks Dedication Fee quick guide · checked
- SnapADU, City of San Diego ADU fees by size · checked
Related calculators
- Los Angeles ADU Cost & Permit Fee CalculatorA 600 sq ft ADU in Los Angeles runs about $315,000 all in, $16,728 of it city and school fees. Price your own build, fees and rental payback.
- San Diego ADU Cost & Permit Fee CalculatorA 600 sq ft ADU in San Diego runs about $309,000 all in, $23,450 of it city and school fees. Price your own build, fees and rental payback.
- San José ADU Cost & Permit Fee CalculatorA 600 sq ft ADU in San José runs about $334,000 all in, $9,519 of it city and school fees. Price your own build, fees and rental payback.
- Mortgage CalculatorYour full monthly house payment, with property tax, insurance, PMI and HOA, plus an amortization schedule.
- BRRRR CalculatorBuy, rehab, rent, refinance: see how much cash stays in the deal and whether it still cash-flows.
More in Construction & DIY
- San Francisco ADU Cost & Permit Fee Calculator
- Fresno ADU Cost & Permit Fee Calculator
- Sacramento ADU Cost & Permit Fee Calculator
- Long Beach ADU Cost & Permit Fee Calculator
- Oakland ADU Cost & Permit Fee Calculator
- Bakersfield ADU Cost & Permit Fee Calculator
- Anaheim ADU Cost & Permit Fee Calculator
- Santa Ana ADU Cost & Permit Fee Calculator
- All 36 Construction & DIY calculators